To mark a task as required, check the box “Required” when designing your control.

If you want to make sure that a question or a task in your control is completed by the assignee, you can mark the tasks as “Required”. Using the “Required” function means that the control cannot be completed without an answer.

If the box is not checked, the assignee can complete the control without completing the question or task.